CustomerCenter > Bid Information > Pre-Bid Information > Comments on Competitive Contract 목록 - Notice No., Notice Date, Item for Bid, Opinion Submission Due Date
Notice No.
Notice Date
Item for Bid
Opinion Submission Due Date
202301
2023-01-02
Consulting for technical support on the key licensing issues for innovative small modular reactor
2023-01-08, 09:00 a.m. (KST)
202203
2022-10-27
Technical Consultation for Engineering of Induction Melting System & General Arrangement of Radioactive Waste Treatment Facility from Decommissioning of Pressurized Heavy Water Reactor
2022-11-02, 09:00 a.m. (KST)
202202
2022-08-22
Consultancy Service for VAT Refund, TAX Resolution, Financial Statements in Fiscal Year of 2022, and Closure of KEPCO E&C Branch in Ghana
2022-08-28, 09:00 a.m. (KST)
202201
2022-07-19
Technical Consultation on Design Verification of Seismic Analysis Models considering Soil-Structure Interaction Effects for Major Structures of Non-standard Nuclear Power Plants
2022-07-25, 09:00 a.m. (KST)
202107
2021-12-30
Consultancy Service for VAT Refund, TAX Resolution and the Closure of KEPCO E&C Branch in Ghana
2022-01-05, 09:00 a.m. (KST)
202106
2021-10-12
Technical Consulting Service for Development of Methodology for Radiological Characterization Evaluation of a Subsurface Residual Radioactive Contamination
Oct.18, 2021, 09:00 a.m. (KST)
202105
2021-09-02
Technical Consulting Service for Development of the Statistics Based Radiological Characterization Guideline of very low contaminated wastes generated during decommissioning of the Commercial NPPs
Sep.08, 2021, 09:00 a.m. (KST)
212104
2021-08-06
Technical Consulting Service for Characterization and Assessment of External Hazards (Organic and Biological Debris) related to Ultimate Heat Sink at the Barakah NPP Units 1 to 4
2021-08-12, 09:00 a.m. (KST)
202103
2021-07-23
Technical Service for the Seismic Probabilistic Safety Assessment and Probabilistic Ultimate Pressure Capacity Evaluation on Shin-Kori NPP Unit 5&6
2021-07-29, 09:00 a.m. (KST)
202102
2021-05-07
Delay and Quantum Analysis and Advisory Service of BNPP
2021-05-13, 09:00.a.m. (KST)