본문으로 바로가기

New Start, New Standard
Comments on Sole Source Contract

Customer CenterComments on Sole Source Contract
CustomerCenter > Bid Information > Pre-Bid Information > Comments on Sole Source Contract Search

All 487 Page 10/49

CustomerCenter > Bid Information > Pre-Bid Information > Comments on Sole Source Contract 목록 -Notice No., Notice Date, Contract Title, No. of Opinion, Status
Notice No. Notice Date Contract Title Status
397 2019-03-26 Consulting Services for Design Optimization of CEDM Cooling Fan for Large Capacity Nuclear Power Plant Close
396 2019-03-18 Verification and Validation of Crack Stability Evaluation Method and Probabilistic Leak-Before-Break (LBB) Close
2019-05 2019-02-21 Evaluation of Feasibility Issues for Canned Motor Reactor Coolant Pump Application and Arrangements for iPOWER Close
2019-04 2019-02-14 Technical Consultation for Design of Pipe Penetration for Double Containment Building Close
2019-03 2019-02-01 Technical consulting service for validation the PSHA(Probabilistic Seismic Hazard Analysis) of Stress Test(Part 1,2) for NPP Close
2019-02 2019-01-24 Hydraulic Study for Discharge Pond with Desalination Facility for SHN1&2 Close
2019-01 2019-01-16 Technical Advisory Service on Scale-up Optimization of Gasification Plant for 2nd Taean IGCC Plant Close
2018-36 2018-12-26 Technical consulting service for determining the characteristics(tracks, radius of maximum wind, maximum wind speed, etc.) of 100,000-year return period typhoons passing over the Wolsong NPP site Close
2018-35 2018-11-20 Behavior and Design of Steel Plate Composite (SC) Wall – to –Reinforced Concrete (RC) Wall Mechanical Connections Close
2018-34 2018-11-07 Consulting Services for the Conceptual Design of Reactor Service Equipment and Fuel Handling Equipment for Small Modular Reactor Close

콘텐츠 만족도 조사

담당자 정보

  • Dep.
    Finance Team. DONG HYUN-YI
  • Tel
    +82-54-421-8736